Keep up to dateElemental cost analysis of out-turn cost of building (January 2003) | ||||
Element | Total cost/m2 (out-turn) | cost/m2 gfa | % split | Notes |
Substructure | 405,500 | 208.26 | 7.41 | concrete strip foundations and reinforced ground floor slab; anti vibration provisions |
Superstructure | Ìý | Ìý | Ìý | Ìý |
Frame | 200,800 | 103.13 | 3.67 | structural steel frame |
Roof | 292,300 | 150.13 | 5.34 | Planja metal deck with Trocal single-ply membrane; feature rainwater goods |
Stairs | 0 | 0 | 0 | Ìý |
External walls | 546,500 | 280.68 | 9.99 | aluminium curtain walling, Sto render system, cedar wood cladding; galvanised mesh screens |
Windows and external doors | 57,000 | 29.28 | 1.04 | Ìý |
Internal walls | 127,547 | 65.51 | 2.33 | plasterboard metal stud partitions |
Internal doors | 29,916 | 15.37 | 0.55 | hardwood veneer doors in hardwood frames |
Internal finishes | Ìý | Ìý | Ìý | Ìý |
Wall finishes | 8600 | 4.42 | 0.16 | emulsion paint; tiled splashbacks |
Floor finishes | 50,758 | 26.07 | 0.93 | raised access flooring; carpet tiles generally; vinyl to wet kitchen and WC |
Ceiling finishes | 53,058 | 27.25 | 0.97 | Casoline curved or flat plasterboard |
Fittings | Ìý | Ìý | Ìý | Ìý |
Fittings | 51,177 | 26.29 | 0.94 | kitchenette area; general signage; laboratory fittings |
Sanitary fittings | 2000 | 1.03 | 0.04 | Ìý |
Services | Ìý | Ìý | Ìý | Ìý |
Public health/mechanical | 735,464 | 377.74 | 13.44 | Ìý |
Electrical | 333,511 | 171.30 | 6.10 | Ìý |
Cleanrooms | 995,669 | 511.38 | 18.20 | Ìý |
Lifts | 0 | 0 | 0 | Ìý |
BWIC | 39,400 | 20.24 | 0.72 | Ìý |
Site works | Ìý | Ìý | Ìý | Ìý |
Hard and soft landscaping | 552,400 | 283.72 | 10.10 | access road; timber cribb wall; general planting and paving; ramps; balustrades |
External services and drainage | 243,500 | 125.06 | 4.45 | below-ground drainage, manholes and services; transformer and enclosure |
Service connections | 9,700 | 4.98 | 0.18 | Ìý |
Sundries | 181,700 | 93.32 | 3.32 | Ìý |
Prelims and pre-con fee | 418,500 | 214.95 | 7.65 | Ìý |
Overheads and profit | 135,000 | 69.34 | 2.47 | Ìý |
Total | 5,470,000 | 2809.45 | 100 | Ìý |