Keep up to dateElemental cost analysis for Chipping Norton Leisure Centre (gross floor area 3,050 m2) | |||||
Main element | Breakdown | £ | £/³¾2 | % | Specification |
Substructure | Ìý | 302,321 | 99.12 | 7.49 | Ìý |
Superstructure | Ìý | Ìý | Ìý | Ìý | Ìý |
Ìý | frame | 194,108 | 63.64 | 4.81 | Steel frame, glue-laminated timber column and beam |
Ìý | upper floors | 19,224 | 6.30 | 0.48 | Parallel-strand timber beam, plywood deck |
Ìý | roof | 438,468 | 143.76 | 10.87 | Aluminium standing seam on steel/aluminium/timber deck. Thermally broken glass/ |
Ìý | stairs | 6,248 | 2.05 | 0.15 | Beech joinery |
Ìý | external walls | 307,947 | 100.97 | 7.63 | Outer leaf brickwork/oak cladding. Inner leaf blockwork |
Ìý | windows and external doors | 42,073 | 13.79 | 1.04 | Aluminium, thermally broken glazing units/curtain walling. Sliding door units |
Ìý | internal walls and partitions | 138,424 | 45.38 | 3.43 | Fairfaced/block/brick |
Ìý | internal doors | 81,342 | 26.67 | 2.02 | Timber doorsets |
Ìý | subtotal | 1,227,834 | 402.57 | 30.44 | Ìý |
Internal finishes | Ìý | Ìý | Ìý | Ìý | Ìý |
Ìý | wall finishes | 132,666 | 43.50 | 3.29 | Douglas fir lining to pool hall |
Ìý | floor finishes | 171,425 | 56.20 | 4.25 | Battened timber flooring to dry sports spaces/tiling to wet areas. Rubber to public areas |
Ìý | ceiling finishes | 41,435 | 13.59 | 1.03 | Plastered suspended ceilings, acoustic where appropriate. Timber deck to pool hall |
Ìý | subtotal | 345,526 | 113.29 | 8.56 | Ìý |
Fittings and furnishings | Ìý | 136,805 | 44.85 | 3.39 | Ìý |
Services | Ìý | Ìý | Ìý | Ìý | |
Ìý | sanitary appliances | 20,484 | 6.72 | 0.51 | Ìý |
Ìý | mechanical installation | 442,403 | 145.05 | 10.97 | Cross plate heat exchangers to pool AHU. Localised mech vent to fitness suite |
Ìý | electrical installation | 304,329 | 99.78 | 7.54 | Low-energy luminaires. Thermostatically controlled radiant panels to sports hall |
Ìý | moving floor installation | 70,488 | 23.11 | 1.75 | Ìý |
Ìý | filtration installation | 82,337 | 0.86 | 2.04 | Sodium hypochlorite with ultraviolet filtration |
Ìý | builders’ work in connection | 8,102 | 2.66 | 0.20 | Ìý |
Ìý | subtotal | 928,143 | 304.31 | 23.01 | Ìý |
¾«¶«Ó°ÊÓ | Ìý | 2,940,629 | 964.14 | 72.89 | Ìý |
External works | Ìý | Ìý | Ìý | Ìý | Ìý |
Ìý | Site works | 472,674 | 154.98 | 11.72 | Access road, carpark, four-court multi use games area, entrance court, soft landscaping |
Ìý | Drainage | 144,640 | 47.42 | 3.59 | Ìý |
Ìý | External services | 90,022 | 29.52 | 2.23 | Ìý |
Ìý | subtotal | 707,336 | 231.91 | 17.53 | Ìý |
Preliminaries | 386,285 | 126.65 | 9.58 | Ìý | |
Total project cost | 4,034,250 | 1,322.70 | 100 | Ìý | |
Contingencies | Ìý | 125,250 | Ìý | Ìý | Ìý |