Keep up to dateWhole-life cost summary for three model buildings over 25 years | |||||||||
40 000 ft2 | 100 000 ft2 | 200 000 ft2 | |||||||
Total cost 拢 | Cost 拢/蹿迟2 | % of total cost | Total cost 拢 | Cost 拢/蹿迟2 | % of total cost | Total cost 拢 | Cost 拢/蹿迟2 | % of total cost | |
Capital | |||||||||
Build cost | 3 536 000 | 88.40 | 11.47 | 8 566 000 | 85.66 | 13.03 | 23 600 000 | 118.00 | 17.74 |
Less capital allowance | 328 848 | 8.22 | 1.07 | 796 638 | 7.97 | 1.21 | 2 194 800 | 10.97 | 1.65 |
Subtotal | 3 207 152 | 80.18 | 10.41 | 7 769 362 | 77.69 | 11.82 | 21 405 200 | 107.03 | 16.09 |
Finance cost (real) | 4 505 785 | 112.64 | 14.62 | 10 915 314 | 109.15 | 16.60 | 30 072 544 | 150.36 | 22.61 |
Total building cost | 7 712 937 | 192.82 | 25.03 | 18 684 676 | 186.85 | 28.42 | 51 477 744 | 257.39 | 38.70 |
Occupancy | |||||||||
M&E maintenance | 2 025 000 | 50.63 | 6.57 | 3 000 000 | 30.00 | 4.56 | 5 500 000 | 27.50 | 4.14 |
Lifts | 50 000 | 1.25 | 0.16 | 100 000 | 1.00 | 0.15 | 150 000 | 0.75 | 0.11 |
Fabric | 500 000 | 12.50 | 1.62 | 1 250 000 | 12.50 | 1.90 | 2 500 000 | 12.50 | 1.88 |
External land | 206 000 | 5.15 | 0.67 | 352 500 | 3.52 | 0.54 | 605 000 | 3.02 | 0.45 |
Internal planting | 149 400 | 3.73 | 0.48 | 309 800 | 3.10 | 0.47 | 559 800 | 2.80 | 0.42 |
Cleaning | 1 200 000 | 30.00 | 3.89 | 3 000 000 | 30.00 | 4.56 | 6 000 000 | 30.00 | 4.51 |
Waste | 77 000 | 1.93 | 0.25 | 196 750 | 1.97 | 0.30 | 400 000 | 2.00 | 0.30 |
Electricity | 2 360 000 | 59.00 | 7.66 | 5 900 000 | 59.00 | 8.97 | 11 800 000 | 59.00 | 8.87 |
Gas | 150 000 | 3.75 | 0.49 | 375 000 | 3.75 | 0.57 | 750 000 | 3.75 | 0.56 |
Water | 120 000 | 3.00 | 0.39 | 300 000 | 3.00 | 0.46 | 600 000 | 3.00 | 0.45 |
Reception service | 809 600 | 20.24 | 2.63 | 809 600 | 8.10 | 1.23 | 1 214 400 | 6.07 | 0.91 |
Communications | 3 380 900 | 84.52 | 10.97 | 4 584 475 | 45.84 | 6.97 | 5 680 000 | 28.40 | 4.27 |
Post room | 379 200 | 9.48 | 1.23 | 733 400 | 7.33 | 1.12 | 833 400 | 4.17 | 0.63 |
Porterage | 379 200 | 9.48 | 1.23 | 733 400 | 7.33 | 1.12 | 1 087 600 | 5.44 | 0.82 |
Internal moves | 4 620 000 | 115.50 | 14.99 | 11 805 000 | 118.05 | 17.96 | 24 000 000 | 120.00 | 18.04 |
Security | 1 528 800 | 38.22 | 4.96 | 3 057 600 | 30.58 | 4.65 | 4 586 400 | 22.93 | 3.45 |
Catering | 2 154 075 | 53.85 | 6.99 | 4 560 665 | 45.61 | 6.94 | 4 586 400 | 22.93 | 3.45 |
Management | 1 125 000 | 28.13 | 3.65 | 1 875 000 | 18.75 | 2.85 | 3 000 000 | 15.00 | 2.26 |
Replacement | 1 890 766 | 47.27 | 6.14 | 4 117 241 | 41.17 | 6.26 | 7 670 912 | 38.35 | 5.77 |
Subtotal | 23 104 941 | 577.62 | 74.97 | 47 060 431 | 470.60 | 71.58 | 81 523 912 | 407.62 | 61.30 |
Whole-life cost over 25 years | 30 817 878 | 770.45 | 100.00 | 65 745 107 | 657.45 | 100.00 | 133 001 656 | 665.01 | 100.00 |
Statistics | |||||||||
Cost 拢/蹿迟2 | 770.45 | 657.45听 | 听665.01 | ||||||
Number of occupants | 308 | 787听 | 听1600 | ||||||
Cost 拢/head | 100 158 | 83 539 | 聽83 126 |
Comparison of service provision in the three sizes of office | |||
40 000 ft2 | 100 000 ft2 | 200 000 ft2 | |
308 occupants | 787 occupants | 1600 occupants | |
M&E maintenance | All planned and reactive mechanical and electrical maintenance 鈥 one resident engineer and a 鈥渕ate鈥 | All planned and reactive mechanical and electrical maintenance 鈥 one resident engineer and a 鈥渕ate鈥 | All planned and reactive mechanical and electrical maintenance 鈥 working site manager, two resident engineers |
Lifts | Two hydraulic lifts | Four hydraulic lifts | Six hydraulic lifts |
Fabric | All reactive fabric maintenance | All reactive fabric maintenance | All reactive fabric maintenance |
External land | Soft and hard landscape maintenance | Soft and hard landscape maintenance | Soft and hard landscape maintenance |
Internal planting | Maintenance of internal plants 鈥 planting to reception, lift lobbies, corridors and sporadically through office | Maintenance of internal plants 鈥 planting to reception, lift lobbies, corridors and sporadically through office | Maintenance of internal plants 鈥 planting to reception, lift lobbies, corridors and sporadically through office |
Cleaning | Accommodation and window cleaning of offices Monday to Friday plus periodics | Accommodation and window cleaning of offices Monday to Friday plus periodics | Accommodation and window cleaning of offices Monday to Friday plus periodics |
Reception service | Two receptionists Monday to Friday 9am-5.30pm | Two receptionists Monday to Friday 9am-5.30pm | Three receptionists Monday to Friday 9am-5.30pm |
Communications | Calls and line rental | Calls and line rental | Calls and line rental |
Post room | One post room operative Monday to Friday | Two post room operatives Monday to Friday | Two post room operatives Monday to Friday |
Porterage | One porter Monday to Friday | Two porters Monday to Friday | Three porters Monday to Friday |
Internal moves | Based on churn rate of 60% | Based on churn rate of 60% | Based on churn rate of 60% |
Security | 24-hour security | 24-hour security | 24-hour security |
Catering | Subsidised catering plus corporate entertaining | Subsidised catering plus corporate entertaining | Subsidised catering plus corporate entertaining |
Management | One resident facilities manager | One resident facilities manager and assistant | One resident facilities manager and two assistants |
Whole-life cost summary for Friars Bridge Court over 25 years compared with model office building | ||||||||
Whole-life cost of 100 000 ft2 Model (787 occupants) | Whole-life cost of 93 423 ft2 Friars Bridge Court (800 occupants) | Cost variance from model | ||||||
Total cost (拢) | 拢/蹿迟2 | 拢/辞肠肠耻辫补苍迟 | Total cost (拢) | 拢/蹿迟2 | 拢/辞肠肠耻辫补苍迟 | %/ft2 | %/head | |
M&E maintenance | 3 000 000 | 30.00 | 3 812 | 3 500 000 | 37.46 | 4 375 | 25 | 15 |
Lifts | 100 000 | 1.00 | 127.00 | 75 000 | 0.80 | 94.00 | 鈥20 | 鈥26 |
Fabric | 1 250 000 | 12.50 | 1 588 | 750 000 | 8.03 | 938.00 | 鈥36 | 鈥41 |
Replacement | 4 117 241 | 41.17 | 5 232 | 4 412 719 | 47.23 | 5 516 | 15 | 5 |
External land | 352 500 | 3.52 | 448.00 | 12 500 | 0.13 | 16.00 | 鈥96 | 鈥97 |
Internal planting | 309 800 | 3.10 | 394.00 | 147 500 | 1.58 | 184.00 | 鈥49 | 鈥53 |
Cleaning | 3 000 000 | 30.00 | 3 812 | 4 112 500 | 44.02 | 5 141 | 47 | 35 |
Waste | 196 750 | 1.97 | 250.00 | 250 000 | 2.68 | 313.00 | 36 | 25 |
Electricity | 5 900 000 | 59.00 | 7 497 | 4 500 000 | 48.17 | 5 625 | 鈥18 | 鈥25 |
Gas | 375 000 | 3.75 | 476.00 | 710 000 | 7.60 | 888.00 | 103 | 86 |
Water | 300 000 | 3.00 | 381 | 425 000 | 4.55 | 531.00 | 52 | 39 |
Reception service | 809 600 | 8.10 | 1 029 | 628 173 | 6.72 | 785.00 | 鈥17 | 鈥24 |
Post room | 733 400 | 7.33 | 932 | 1 277 400 | 13.67 | 1 597 | 86 | 71 |
Security | 3 057 600 | 30.58 | 3 885 | 1 846 000 | 19.76 | 2 308 | 鈥35 | 鈥41 |
Catering | 4 560 665 | 45.61 | 5 795 | 2 425 000 | 25.96 | 3 031 | 鈥43 | 鈥48 |
Facilities management | 1 875 000 | 18.75 | 2 382 | 1 929 250 | 20.65 | 2 412 | 10 | 1 |
Cost over 25 years | 29 937 556 | 299.38 | 38 040.10 | 27 001 042 | 289.02 | 33 751.30 | 鈥3 | 鈥11 |
Internal moves | 11 805 000 | 118.05 | 15 000 | 2 249 600 | 24.08 | 2 812 | 鈥80 | 鈥81 |
Service provision at Friars Bridge Court, London, compared with a model building of similar size | |||
Model office | Friars Bridge Court | ||
(100 000 ft2,787 occupants) | (93 423 ft2, 800 occupants) | Comment on cost differences | |
M&E maintenance | All planned and reactive mechanical and electrical maintenance 鈥 one resident engineer and a 鈥渕ate鈥 | All planned and reactive mechanical and electrical maintenance 鈥 one resident engineer | The higher maintenance costs for Friars Bridge Court reflect the quality of specification for building components |
Lifts | Four hydraulic lifts | Five lifts | |
Fabric | All reactive fabric maintenance | All reactive fabric maintenance 鈥 resident handyman | |
External landscaping | Soft and hard landscape maintenance | Hard landscape maintenance | The model building is set in grounds, whereas Friars Bridge Court has no soft landscaping |
Internal planting | Maintenance of internal plants 鈥 planting to reception, lift lobbies, corridors and sporadically through office | Maintenance of internal plants 鈥 planting to reception, lift lobbies, corridors and sporadically through office | |
Cleaning | Accommodation and window cleaning of offices Monday to Friday plus periodics | Accommodation and window cleaning of offices Monday to Friday plus periodics | The higher cleaning costs at Friars Bridge Court are because the building is multi-tenanted and in central London |
Waste | The higher disposal costs at Friars Bridge Court reflect the difference between its use and that of the model building | ||
Electricity, gas and water | The difference in utility costs between Friars Bridge Court and the model is attributable to the varying level of M&E services and the buildings鈥 use | ||
Reception service | Two receptionists Monday to Friday 9am-5.30pm | One receptionist Monday to Friday 8am-6pm | Friars Bridge Court has one less receptionist than the model building |
Communications | Calls and line rental | Calls and line rental | |
Post room | Two post room operatives Monday to Friday | Two post room operatives Monday to Friday | The costs for Friars Bridge Court are higher because it is multi-tenanted |
Porterage | Two porters Monday to Friday | Carried out by handyman | |
Security | 24-hour security | 24-hour security | Costs at Friars Bridge Court reflect the fact that the building has only one entrance and is considered a low-risk building, whereas the model office has two entrances |
Catering | Subsidised caterings and corporate entertaining | Subsidised catering | The difference in catering costs between the two buildings reflects the higher subsidies and level of hospitality in the model building and the low take-up rate at Friars Bridge Court because of its central location |
Facilities management | One resident facilities manager and assistant | One resident facilities manager | The building has six tenants, whereas the model has one 鈥 this is a factor in the low churn costs. |