All ¾«¶«Ó°ÊÓs, Design and Specification articles – Page 38
-
¾«¶«Ó°ÊÓ
Green light for 15-storey tower clears path for AHMM Southwark tube scheme
Approval for Bell Phillips plan paves way for major office project in south London borough
-
¾«¶«Ó°ÊÓ
Camden green lights £1bn King’s Cross pharma centre
Scheme faces objection from campaign group as it heads to GLA for final sign-off
-
¾«¶«Ó°ÊÓ
Review of Parliament refurbishment plan delayed again
Announced last May, review had been due to be published last autumn
-
Features
Arcadis’ new London HQ: What goes into a post-covid office
The hybrid work model has arrived - with fewer desks but a big focus on smart tech and wellbeing
-
¾«¶«Ó°ÊÓ
In pictures: The new building Arcadis will call home this summer
 Consultant will move into City block this June
-
¾«¶«Ó°ÊÓ
Consultants pick up £18m in six months for Parliament restoration work
Project manager CH2M and architect BDP paid bulk of figure
-
¾«¶«Ó°ÊÓ
Everton’s £500m stadium gets planning go-ahead
Planners voted unanimously in favour of Laing O’Rourke scheme this morning
-
Features
Tax relief: the Structures and ¾«¶«Ó°ÊÓs Allowance
The Structures and ¾«¶«Ó°ÊÓs Allowance extends tax relief from plant and machinery to cover other parts of a non-residential building or structure but it can be hard to adminster
-
¾«¶«Ó°ÊÓ
Plan for London’s £288m Centre for Music scrapped
International architectural competition for Barbican refurb to be launched instead
-
Features
Costing Steelwork 16: Market update
Costing Steelwork is a series from Aecom, BCSA and Steel for Life that provides guidance on costing structural steelwork. This quarter provides a market update and updates the five cost models previously featured in Costing Steelwork
-
Features
Rethinking Design: how to prepare schools for the next pandemic
Continuing our series on rethinking design in the wake of the coronavirus, Jordan Marshall reports on how architects are trying to future-proof school buildings while making new-builds net zero
-
¾«¶«Ó°ÊÓ
London NHS trust worries cost of dealing with covid will make new hospital too expensive
Bosses say meeting new requirements will make St Helier scheme ‘unaffordable’
-
¾«¶«Ó°ÊÓ
National Gallery launches competition to revamp London landmark
Winner for international competition due this July
-
¾«¶«Ó°ÊÓ
BDP working up plans for next hospital in rebuilding programme
Practice drawing up proposals for new Watford General Hospital
-
Information - ¾«¶«Ó°ÊÓ
On-demand webinar: The CLC on construction’s role in kick-starting economic recovery
This free Construction Leadership Council webinar is available on demand
-
¾«¶«Ó°ÊÓ
Plans submitted for hundreds of flats at Seifert’s Tolworth Tower
Masterplan will add two towers and convert post-war landmark from offices
-
Features
Modular timber frame eco-buildings: Inspiring spaces in education, leisure and business
AÂ sectional modular system can create a standalone space with a difference
-
Features
22 Handyside Street: advanced geometry, passed with distinction
Argent’s 30-hectare King’s Cross development in central London is a compendium of fashionable architects, a reference book in built form.
-
Features
Hollywood healthcare comes to Qatar
Power International Holding and Elegancia Healthcare to build 250-bed, state-of-the-art hospital in Doha