Images show corrosion to prefabricated concrete panels

The damage which has forced the closure of the Hammersmith flyover for the forseeable future can be revealed.

Pictures obtained by BBC London ¾«¶«Ó°ÊÓ show the rusting of cables in the prefabricated concrete trusses supporting the flyover.

Transport for London said on Friday that it was closing the 50-year old structure for at least another week while it examines the extent of the damage.

It also committed itself to putting a solution in place to deal with the damage, caused by water and salt water ingress into joints in the concrete, before the .